PVP approach
With per-connection charging: charge for several consecutive connections = charge for several connections
- Less overhead than per-connection charging
- Simpler for the interconnecting operator (operator 2)
- Originating operator (operator 1) must forecast the required interconnect capacity
- Less versatile than switched connections